SabCh
SabCh
| Client | Sabena Engineering |
| Mission | Delegate Project Manager |
| Design offices | Not defined as of today |
| Contractor | Not defined as of this day |
| Location | Charleroi, 11 avenue des Fusillés |
| Project Type | New build |
| Type of building | Industrial building Industrial building |
| Surface area | 10.000 m² |
| Period | July 2025 – January 2029 |
| Cost | N/A |
The project SabCh consists of the construction of a hangar for the dismantling of civil aircraft belonging to Sabena Engineering, as well as the renovation of a logistics hangar located in Charleroi.
The two main challenges of this project are:
- Design and implement a project that must be completed while keeping the site operational.
- Concevoir un projet permettant le recyclage des avions, et intégrer dans ce projet tous les besoins en lien avec la logistique du site.
Our mission is to assist the project owner from the drafting of the programme through to the handover of the works. a8> works by assuring the role of conductor throughout the project.